Handover inspections around Lisbon: what we found, and what it saved the buyer

New-build and remodelled flats are where most of the Lisbon work comes from now. The developer wants the escritura done, the buyer wants the keys, and the walk-through is an hour with the sales rep. Here is what turned up when we went through three of them properly, and what it was worth to the people buying.

Taking the keys to a new build? Our handover inspection goes through it before you sign the auto de receção, while the final payment is still yours. From €690 + IVA.

A remodelled T2 in Setúbal, the week before the hearing

Early-1900s building in the historic centre, masonry kept, everything inside new. The buyer had signed the CPCV two years earlier, the works were still going, and the developer and the buyer had stopped agreeing on what finished meant. We went through it on a Wednesday morning. The hearing was that afternoon.

Floors and skirtings were out across the whole flat. Four window sills needed remaking, and those were the sills under the leaks the buyer had been reporting every winter. The microcement in both bathrooms was poorly finished. Fixtures were loose, the vanity units weren’t fixed to the wall, and the service bathroom wasn’t connected at all.

Then we read the contract. The Mapa de Acabamentos said built-in fridge; the fridge was freestanding and the door was hung the wrong way. There was a circuit for a dishwasher and no dishwasher. The extractor hood had no fixed socket. The air-conditioning units in the contract had never been delivered, and they were the only heating planned for the main rooms. None of that is a finishing snag. It is the developer not supplying what was sold.

Our figure for putting it right, at a developer’s own rates rather than ours, came to €14,660 to €26,260 ex IVA. The buyer had a one-page note of the headline findings in hand before the hearing and the full bilingual report two days later. It is now with his lawyer.

Cracked window sill with a water mark below it in a top-floor flat
A sill that leaks shows itself below the window, not at it. Four of these in one flat is a detailing problem, not bad luck.

Want it checked before you sign? Handover inspection from €690 + IVA: thermal camera, every system tested, a defects list the developer has to answer.

A renovated ground-floor flat: €490 in, €1,340 to €2,920 back

This one was a pre-purchase inspection on a freshly renovated flat, so the handover questions and the buying questions were the same questions. The flat itself was good. Electrics to standard, plumbing done well and pressure tested. What was wrong was the stuff a sales walk-through steps over: a pocket door grabbing on a screw left in the wall and scratching itself every time it opened, no handle on it at all, gaps at the skirting joints, paint overfill, and a builder’s clean that hadn’t happened.

The bigger item was outside. The whole building had just been re-roofed and nobody had fitted gutters. Rainwater was coming straight off the tiles onto the render. That is a shared cost, so we pulled the buyer’s permilagem from the caderneta and worked out her share: €610 to €1,370 of a €2,000 to €4,500 job.

Her direct snags came to €730 to €1,550. The negotiation range we gave her was €1,340 to €2,920, with the advice to push for the snags to be finished before the deed rather than take cash, and to get the gutters in writing. The inspection cost €490.

A mould smell, three years after the keys

New build, bought from the developer, handover somewhere between two and five years ago. The owner called because the house smelled of mould and he couldn’t find it. On the day there was nothing visible. There had been water coming in at the front door early on, fixed since with an awning and a slot drain, and the smell had never gone.

He is inside the warranty. In Portugal a new build carries ten years on structural defects and five on the rest, and a smell with a history of water entry is a defect. But proving it three years on is slower and more expensive than listing it on handover day, when the developer still needs your signature. That is the whole point of doing the inspection before the auto de receção rather than after.

The one-hour walk-through

One buyer came to us after a developer told him he had one hour to inspect, and that anything found after that hour was his problem. That isn’t how it works. The warranty doesn’t expire at the end of the walk-through. But the leverage does. Before the escritura, the developer fixes things because they want the sale. After it, you are writing letters.

What we do in that hour, or the day before it, is the full list: thermal imaging and moisture readings on every wall and around every window, falls to drains and waterproofing at showers and terraces, RCD trip tests and every socket, pressure and flow at every outlet, extraction actually extracting, doors and windows operated, and the paperwork the developer owes you checked off. Then the finishes, against the contract, line by line. The handover process itself and the auto de receção are covered in their own articles.

Lisbon days

We are in Lisbon on fixed days each month. Handover inspection €690 + IVA, pre-purchase from €490 + IVA, plus travel, quoted before you book. The next dates and the full price list are on the Lisbon inspections page. If your escritura is days away, the same-day report (€150 + IVA) puts the list in your hand before you sign.

Cases above are from our own reports in 2026, with details that would identify the property left out. Cost figures are the ranges given in the reports, ex IVA, and are indicative.

Taking the keys to a new build?

We inspect before you sign the auto de receção, while the final payment is still in your hands. Thermal camera, every system tested, a defects list the developer has to answer and a letter for your lawyer. Apartments from €690 + IVA, townhouses €790, villas €890. Re-check of the agreed items, €290 + IVA.

Handover plus the 11-month check before the short warranties run out: €1,090 + IVA for the pair.

Or message Brad on WhatsApp. Same-day reply.

← Back to all articles · Ler em português

The Porto Property Buyer’s Checklist.

What to check before you sign the CPCV — the defects we find again and again on real surveys, from damp and roofs to the condominium paperwork almost nobody reads. Two pages, from a builder, free.

Bought it already and planning work? We check the builder’s quote before you sign it (Quote Check, €220 + IVA), and for owners renovating from a distance we run the job as your representative on site (Project Management).

WhatsAppPrices