New-build defects in Portugal: how the 10-year and 5-year warranty works

If you bought a new home from a developer in Portugal, the law gives you a long warranty. A lot of buyers don’t get the benefit of it because they don’t know the periods, report defects by phone, or wait too long. Here is how it works and how to use it.

Which law applies

If you bought as a consumer from a professional seller under a contract signed on or after 1 January 2022, the rules are in Decree-Law 84/2021. For older contracts, or where you hired a builder directly to build for you, the Civil Code applies (article 1225 for construction). Your lawyer will confirm which applies to you.

The periods under DL 84/2021

The old requirement to report a defect within a fixed time of finding it was dropped for these contracts. Waiting is still a bad idea. A late report is harder to prove, and by then the defect has usually done more damage.

Older contracts and builder contracts

Under article 1225 of the Civil Code the warranty runs for 5 years from handover. You have to report the defect within a year of finding it, and bring a claim within a year of reporting. Those deadlines are short and they are enforced.

What we find in new builds

The same faults come up again and again: tiled terraces with no proper membrane underneath, poor sealing around windows, bathroom extract fans that don’t extract, open joints and failed silicone around showers, condensation and mould in the first winter, cracked render and drainage laid without enough fall. Most are within the 5-year period. Some, left long enough, turn into something bigger.

Open joint between floor and wall tiles in a new bathroom
An open joint where the floor meets the wall in a new bathroom. Water gets behind tiles through gaps like this.

How to report a defect so it counts

When the developer ignores you

Consumer arbitration centres (centros de arbitragem de consumo) handle disputes like this and are usually quicker and cheaper than court. For bigger defects, use a lawyer. Either of them will want evidence. We write independent defect reports: what the defect is, its likely cause, what the repair involves and a cost range.

Before you take the keys

The cheapest time to deal with defects is before you sign for the property. Book a handover inspection and read what you’re signing at the auto de receção, including how to sign it with reservations.

General information, not legal advice. Confirm which rules apply to your contract with a Portuguese lawyer.

Sources: Decreto-Lei n.º 84/2021 (arts. 23.º and 25.º); Código Civil, art. 1225.º.

Thinking of buying — or stuck with a problem?

If you’ve found a property, or you’re fighting damp that keeps coming back, talk to us before you commit to anything. WhatsApp is the fastest way to reach us — we respond the same day, in plain English.

Message us on WhatsApp

← Back to all articles

The Porto Property Buyer’s Checklist.

What to check before you sign the CPCV — the defects we find again and again on real surveys, from damp and roofs to the condominium paperwork almost nobody reads. Two pages, from a builder, free.

Navigating licensing on your own build? We run the process for you — programme, permits, trades and quality gates. See Project Management.