Renovation gone wrong in Portugal: how our Build Rescue works

Most of the calls we get that start with “I don’t know what to do” fall into one of three groups. The builder has stopped. The work is finished but it isn’t right. Or the job is still going and the owner has lost track of where the money is. Build Rescue is how we deal with all three, and it works the same way whether you’re in Porto or running the job from London or Melbourne.

Builder stopped or walked off? Build Rescue: we assess what’s been done, put it in writing and find a builder to finish it, working for you and nobody else. Job still running but nobody checking? Project Room from €690 + IVA a month.

Who calls us

What the rescue covers

1. Where it really stands. We go through the building on site with a thermal camera and moisture meter and record what’s built, what’s built wrong and what has been certified. Everything is measured and photographed.

2. The paperwork. Contract, invoices, payments made against work actually done, whether the licence is still live and who is named as diretor de obra. On a stopped job the gap between what you’ve paid and what’s standing is the number everything else depends on.

3. A written position. What’s owed, what can be kept, what has to come out and what it costs to finish, as cost ranges ex IVA. If there’s money in dispute, this goes to your lawyer so they’re working from evidence. The legal side is theirs.

4. A new builder. We tender the remaining work to contractors we’ve vetted, level the quotes and recommend one. You hold the contract and we take no commission from anyone.

5. Run it to the finish. After the deposit nothing gets paid until we’ve inspected the stage and signed it off. You get photo reports in plain English, then snagging and the paperwork for the licença de utilização.

Electrical socket pulled out of a broken wall tile with the wiring exposed in a recent renovation
A socket hanging out of a broken tile in a recent renovation. Finished work like this is where many of our rescue jobs start.

What putting it right costs

These come from our own reports on renovations that went wrong, ex IVA:

A rescue doesn’t always mean ripping everything out. On one Porto house the sandwich-panel roof had no end caps or flashings. Fixing the junctions came to €2,200–2,800 against €8,000–12,000 to replace it, and the panels themselves were sound. Part of the job is telling you which work can stay.

If the builder is still on site and you just need someone checking, the Project Room from €690 + IVA a month is the lighter route.

What we charge

The assessment and written position is a fixed fee, agreed before we travel. Tendering the remaining work is a second fixed fee. Running the job to the finish is a monthly retainer set by how often we need to be on site, fortnightly for a job that’s going well and weekly for one that needs a firm hand, with travel included. Our fee is set out on its own line, separate from the build budget, and it doesn’t move with the builder’s costs.

Don’t sit on it

A stopped job keeps costing money. Open roofs and bare blockwork take the weather, scaffold hire runs on and licences have end dates. If your builder has only just gone, read what to do in the first week. For a finished job that’s gone wrong, this badly renovated Porto house shows what we find. And the half-built stone house in the Serra da Estrela shows how we picked up a stalled build and got it costed and moving again. The full service is on the project management page.

Figures are from our own inspection and defect reports in 2025 and 2026, ex IVA, with names and addresses left out. Every job is different, so treat them as a guide to scale, not a quote.

What the Project Room looks like

One private page on your phone. No app, no login. This is a demonstration job.

Project Room home screen: the stage in progress, the next visit before cover-up, and a variation waiting for the owner's decision
Home. Where the job is this week, and the one thing that needs you.
Project Room progress screen: stages that get covered up, which ones we have photographed and checked, and the stage list
Progress. The stages that disappear behind plaster and tiles, and whether we’ve seen them first.
Project Room money screen: paid to the builder against work we have seen, with a warning when payment is ahead of progress
Money. What you’ve paid next to what we’ve actually seen built. When the first runs ahead of the second, it says so.

Job gone wrong?

Builder stopped, work done badly, or a job that’s got away from you. We assess it, put the state of the works in writing, find a builder to finish it and run it to the end, working for you and nobody else. If the builder’s still there and the problem is that nobody’s checking, the Project Room does that from €690 + IVA a month.

Haven’t bought yet? Pre-purchase inspection from €490 + IVA.

Or message Brad on WhatsApp. Same-day reply.

← Back to all articles

The Porto Property Buyer’s Checklist.

What to check before you sign the CPCV — the defects we find again and again on real surveys, from damp and roofs to the condominium paperwork almost nobody reads. Two pages, from a builder, free.

Not sure which you need? Send us the listing or the quote on WhatsApp and we’ll tell you, including when the answer is the cheaper one. All prices.

WhatsAppPrices