Top-floor flats get the light, the views and the roof terraces. They also get the roof leaks first. In a Portuguese condominium the roof is a common part, so the repair is shared by every owner, but you’re the one with the stain on the ceiling while the building argues about it.
Under the Civil Code (article 1424), the cost of looking after the common parts is shared between owners in proportion to the value of their fractions, the permilagem. Your share is the building cost multiplied by your permilagem and divided by 1,000. It’s in the título constitutivo da propriedade horizontal and on the caderneta.
Your share is usually manageable. The real risk is delay. While the condominium debates it, the water keeps coming into your flat, and the internal damage is yours to fix.

Condominiums must put a minimum of 10% of their budget into a reserve fund, and many put in exactly that. On one building in Viana do Castelo the annual budget was €1,683, the reserve stood at €456 at the end of 2025, and there was no plan for the roof or a façade repaint priced at €18,000–30,000. Anything beyond cleaning and light bulbs will arrive as a special levy (quota extraordinária). In the same building a €2,000 levy had been voted with only the shop owner present. More on that case in the flat whose building had €456 in the bank.
Ceilings and wall heads for staining, with moisture readings and thermal imaging, the roof from the roof space and by drone where needed, terrace membranes and outlets, and the parapets. If there’s an active leak, the report separates your direct cost from the building’s, so you can negotiate on both. See the pre-purchase inspection and what a new roof costs.
Figures are from our own inspection reports in 2025 and 2026, ex IVA, with names and addresses left out. Every house is different, so treat them as a guide to scale, not a quote.
General information, not legal advice. Your lawyer should review the condominium documents before you sign.
If you’ve found a property, or you’re fighting damp that keeps coming back, talk to us before you commit to anything. WhatsApp is the fastest way to reach us — we respond the same day, in plain English.
Message us on WhatsAppWhat to check before you sign the CPCV — the defects we find again and again on real surveys, from damp and roofs to the condominium paperwork almost nobody reads. Two pages, from a builder, free.
Navigating licensing on your own build? We run the process for you — programme, permits, trades and quality gates. See Project Management.